Work experience : in July 2001 -- since the second project in Shandong Power Construction Company trades : Power / Title : boiler auxiliary boiler for special duties description : 1, the subsidiary responsible for the boiler installation of the mechanical equipment management technology, boiler heating surface installed two technical management, the subsidiary responsible for the boiler equipment monomer Debugging and mechanical subsystems of the total start-up phase of project management techniques : 2005/05-- experience so far : 4 x 600 MW power plant in eastern Yunnan in Yunnan new project description : B & W, B & W companies in the United States RBC series of technical standards for boilers, In light of the characteristics of the project burned coal, and natural conditions, Performance of the subterranean structure for optimal design parameters RBC boiler. Description : 1 responsibility, subsidiary boiler installation of the mechanical equipment, including debugging Double-Ball Mill, Coal, axial fans, centrifugal fans, pumps and other rotating equipment installation and monomer, debugging technology management system 2 Ash-handling equipment installation, commissioning including slag, the catcher, scraper conveyor, and a highly efficient thickener. Ash pumps and other rotating equipment installation and monomer and technology management system debugging 3, flue gas desulfurization equipment installation project, debugging, rubber lining. Installation management including pipe lined with plastic ball mill, vacuum belt, GGH, oxidation fans, conveyor, Hoist and pumps and other rotating equipment installation and monomer system debugging 4, some coal equipment installation, Debugging including air guns, coal belt, equipment installation and commissioning Deferrizater 5 Some boiler heating surface and the installation of pipelines 2004/04--2005/05 technology management : The Nanhai petrochemical project in Huizhou in Guangdong Nanhai petrochemical Description : 4 x 60 MW steam and electricity cogeneration projects described responsibilities : 1. Boiler subsidiary machinery and equipment, including installation and testing of the main steam-electric-drive fans, burner, sootblowers monomer and other equipment installation, commissioning two systems, fuel pump installation and monomer system debugging 3. Installation management boiler heating surface 4 Pipeline installation technology management 2002/11--2004/04 part of the factory : Jining, Shandong Huaneng Power Plant Project Description : 2 x 135 MW circulating fluidized bed boiler described responsibilities : 1. Boiler subsidiary mechanical equipment installation including Axial Fan, a centrifugal fan, blower and blower. monomer air compressor and other equipment installation, commissioning two systems, hydraulic ash handling system equipment installation and monomer 2001/07--2002/11 system debugging : Huaneng Dezhou Power Plant Project description : three 2 × 660MW boilers manufactured by Babcock and Germany. Type of subterranean boiler, a heat Intermediate natural cycle furnace, a coal-fired boiler responsibility description : Boiler subsidiary mechanical equipment installation including Double-Ball Mill, axial fan, centrifugal fan and the installation of equipment for coal and other monomers, system debugging educational experience : Shandong Institute of Architecture and Engineering, Mechanical Design Automation and 1997/07--2001/07 undergraduate 1994/07-1997/07 Tai'an City hero Hill high school certificate : A nationwide computer titles examination 2005/05 2006/04 A-level examinations in English national titles CET - 4 : IT skills Proficiency in Autocad drawing software skilled Office Software