A, useThis product installation in pulverized coal burners before entry pipeline, can cut coal boiler burner and the connection between the need to guarantee system maintenance.Second, the technical parameters1 structure types: drawer-type board structure,2 specifications: MC/MH Φ II - 1127 x 120,3 piping specifications: Φ 610 million,4:12 mm thickness of installation,May: air, coal mixture,6 medium temperature: more than 200 ° c,7. Working pressure: than 0.2 MPa,8. Leakage rate: 09 leakage rate than 0.1%; :10 and piping connections: flange (match for the flange and connection fasteners),11. Driving mode: manual,12 the handwheel diameter: Φ 400,Third, the structure characteristics1 manually inserted in the body, board trap, tight institutions, mechanical transmission system (see diagram) structure.2 the trap door open and close by the interpolation plate structure. In the open, circulation medium in the body without resistance, it is completely open by the channel, to prevent the coal in the valve. Pressure seal cant, and have sealed the wind to seal to prevent leakage medium. Ensure shutoff will circulation medium complete partition.3 flashboard and choose heat-resistant stainless steel materials by mechanical processing, ensure good sealing performance when closed, but also has stronger resistance to change characteristics and corrosion resistance, and open and close, board has cleared seats, accumulate dust to ensure smooth closed plug-in boards.4 for the whole body sealing, wear-resisting cast steel manufacturing, to ensure the precision of the rigid body resistance, heat, and the sealing performance in use, easy deformation.5 the seal, pulled board, choose flexible graphite sealing is reliable, long service life, high temperature resistant. Gland has the function of regulating sealing, choosing leakage.6 the reliable on-off valves with rotation system, ensure the pole normal use.Four, principle of workBoard in silk, realize closed or open. Board in sealing and guide the sport wear, when the valve is closed, the board in the silk, according to the direction of the sealing off the seeker, at the same time, the circulation of cleaning out board in the medium sealing side powder. Board in slant chocking force, board, which ensures the seal tightly sealing seal, When the valve opens, silk, under the action of will board in the spare, medium inside the circulation through unimpeded.Five, loading and unloading equipment instructions1 after unpacking equipment should be carefully read instructions.2 before lifting equipment, discharge the retaining bolt.Six, equipment installation1 before installation, should inspect equipment parts, pay attention to whether have damage, or whether the fasteners, loose.2 the flow direction of medium shown signs according to equipment and pipe connection and bolt fastening bolts.Seven, equipment maintenance1. According to open and close the valve, the frequency to the transmission parts regularly scrub, refueling.2 check valve using three months after the packing gland sealing condition, such as the leak, should tighten packing gland bolts evenly.3 should check whether fasteners.Add: inserts installation drawing trap.