In-lineinspection生产中验货finainspection/pre-shipmentinspection完工后验货
inspect the goods
NANCY,could you help me to change the date of goods inspection to September 8th ? Because some materials are not in place as scheduled.
inspection
XX will inspect the goods on XXXX
生产过程中的货。这个验货on-lineinspection完工后的产品验货Pre-shipmentInspection一般叫PSI。
347 浏览 7 回答
94 浏览 4 回答
301 浏览 8 回答
92 浏览 9 回答
347 浏览 10 回答
185 浏览 9 回答
274 浏览 6 回答
298 浏览 9 回答
210 浏览 7 回答
224 浏览 6 回答
272 浏览
204 浏览
309 浏览
222 浏览
284 浏览