5, the original machinery maintenance, inspection 1, once a month or every 30 or so requests for washing machines within the bearing oil Cup Pressure Grease, Grease (3 # lithium grease). 2, regular checks bearing lock box, the electrical Block whether movement to ensure Card security. 3, I always check whether the ones bearing lower M14X51 placed to ensure that Bearing no stagnant water and prolong life. 4, triangular belt checks, we must cut off the electricity, and the first call-cylinder motor Block bolts to relax, and then adjust bolts fastening straps rising, rising up the process by hand According to the central belt, bending slightly appropriate final fastening bolts. 5, washers warranty period from the date of the ballot-Mar. Warranty period, outsourcing Annex warranty of six months, and to the self-Mar. Handling, and the environment due to improper use - The damage is not within the scope of the warranty. 6, provide maintenance services outside the warranty period, according to collect fees. The order And door-to-door services, in advance all costs, to provide services.