The project is located in HangKong Road, Xiangyang District, interchange of 218 provincial highway points, at the entrance of Tangbai River and Han River. The total riverbank line , including LiuLiang River ports, Tangbai river , upstream and downstream of LiuLiang River bridge, is 2,000m. With the project of Navigation and Hydropower in Cuijiaying completed, the comprehensive benefit gradually emerges in impoundment, navigation, irrigation, power generation, and tourism, the overall efficiency of the Han River was raised from 500 tons to 1,000 tons. It is a great significance for concentrating land resources, developing and utilizing of water resources scientifically, exerting the value of the Han River channel, promoting of XiangYang and the Han River economic development, adjusting the layout along the river. The project main function defined as rely on storage and industry processing of goods, main by water transport, and supplementary by the aquatic tour, to strengthen cooperation with highways, railways, air transport , promote comprehensive utilization of water transport, thereby to built a Waterborne Integrated Logistics Center for the cargo storage, tally processing, water transport, and aquatic tour.