1, work a. internal and external walls, painted two buildings, including doors, windows, office buildings painted all the walls and pillars. b. All material provided by the owner. c. can not make out half-way drop out contract contracted to indemnify the owners of the economic losses. 2, quality requirements a. The walls should be painted flat, with the eyes can not see the uneven phenomenon. b. the proportion of mortar in strict accordance with the requirements of owner operators. c. walls of injustice need to rework the owners found the wall, place the material cost borne entirely by --------------. 3, contract amount a. All painting inside and outside the office building area is 1100M2. b. Total contractual amount of K4, 000,000.00 c. owners paid the advance payment K ------- 4, time a. From the date of signing the contract duration is 21 days. b. more than 21 days a daily fine of 10% of contract amount. c. If the material supply problems because of suspension, the duration of each day postponed one day work stoppage. Negotiate this contract signed by both parties and, if objection made at the contract before signing the contract, once signed can not be changed. Contractor sign sign owners