第一类、 DL Director Labor直接人工3-2 IDL Indirect Labor间接人工3-3 DLH Direct Labor Hours直接工时3-4 Productivity=UTS/DLH3-5 PPH Pieces Per Hour每小时件数3-6 Efficiency=Actual/Target(%)3-7 DT Machine Down Time停机时间3-8 AI Auto Insertion自动插入3-9 MI Manual Insertion人工插入3-10 SMD Surface Mount Device表面粘着零件SMT Surface mount technology 表面粘着技术3-11 B/I Burn In (for how many hours at how many degree)烧机3-12 Equipment Utilization3-13 WI work instruction 工作说明3-14 SOP standard operation procedure作业指导书3-15 R/I run in 运转机器3-16 ESD electrical static discharge 静电释放3-17 MP mass production 量产3-18 EMC Electro Magnetic Compatibility, 电磁兼容性3-19 EMI Electro Magnetic Interference, 电磁干扰3-19 SIR Surface Impedance Resistance 表面阻抗测试第二类、 Engineer工程4-1 PE Products Engineer; 产品工程Process engineer制程工程4-2 TE Test Engineer测试工程4-3 ME Manufacturing Engineer;制造工程 Mechanical Engineer机械工程4-4 IE Industrial Engineer工业工程4-5 DCC Document Control Center文管中心4-6 BOM Bill Of Material材料清单4-7 ECN Engineering Change Notice工程变动公告4-8 TECN Temporary Engineering Change Notice工程临时变动公告4-9 ATY Assembly Test Yield Total Yield直通率4-10 TPM Total Productivity Maintenance全面生产维护4-11 PM product manager ;project manager 产品经理;项目经理4-12 ECR engineering change request 工程变更申请4-13 ECO engineering change order 工程变更指令4-14 EN engineering notice 工程通告4-15 WPS work procedure sheet 作业说明书4-16 ICT in circuit test 电路测试4-17 P/R pilot run ;C/R control run; T/R trial run试做4-18 EVT engineer verification test工程验证测试4-19 DVT design verification test 设计验证测试4-20 MVT multi-verification test 多项验证测试4-21 ORT on going reliability test 出货信赖性测试4-22 S/W software 软件4-23 H/W hardware 硬件4-24 EAR Engineering Aanlysis Request 工程分析需求4-25 ECE Engineering Change Estimation 工程变更评估4-26 ECC Engineering Change Cancellation 工程变更取消4-27 IEM Internal Engineering Meno 内部工程备忘录4-28 PAS Part Approval Sheet 零件承认书4-29 DAB Daily Action Boaed 日常工作广告牌4-30 TMR Tooling Modify Report 修模协议书4-31 CRT Control Run Testing 试产测试4-32 DCD Design Change Description 设计变更通知4-33 ESR Engineering Study Report 工程研究报告4-34 EI Engineering Information 工程讯息4-35 PMP Process Management Plan 制程管制计划4-36 MBO Management By Object 目标管理4-37 KPI Key Performance Indicator 重点绩效指标4-38 PIP Part Inspection Plan 零件检验标准4-39 CTF Criticle To Function 功能重点尺寸4-40 CTA Criticle To Assembly 组装重点尺寸4-41 R&D Research and Development 研究与开发4-42 GR&R Gauge Repeatability and Reproducibility 治具重复性及重现性验证4-43 Cpk 制程能力指标4-44 FAI First Article Inspection 首件检查表